Removing a wait does not delete the work inside it. The work moves to whoever is standing closest, and the proposals that earn well in Week 7 say that out loud and name the person. This page describes what a finished future state proposal contains and which of its sections carry the points.

What this page holds

This page holds a finished NR 543 Week 7 future state proposal, showing what the redesigned route looks like on paper, what it claims to save, and where marks go. Searches like "nr 543 week 7 assignment example", "nr543 week 7 sample" and "nr 543 week 7 example" land here.

What a finished NR 543 Week 7 future state proposal looks like

A finished proposal contains two drawings and one argument. The first drawing is the process as it runs; the second is the process as proposed, at the same level of detail and drawn with the same symbols, so that setting one beside the other shows exactly which boxes went away. The argument sits between them. Every removed wait has a stated destination: automated, absorbed by an existing role, batched differently, or genuinely eliminated because the step was never needed. Numbers appear twice, once for each drawing, and the claimed saving is the difference rather than a separate assertion. A short section names who does more work under the new design, because there is almost always somebody, and a proposal that cannot name them has not been thought through.

How a NR 543 Week 7 example is structured

The proposal opens by restating the problem in numbers taken from the earlier weeks rather than in adjectives. The proposed route follows, drawn and then described in prose, with each change marked rather than left for the reader to spot. Each change then gets its own short case: what it removes, who now performs it, what it costs in keystrokes or minutes per item, and what could go wrong. Alternatives appear next, including the option of changing nothing, and each is turned down on a named ground so the section does not read as advocacy. Sequencing follows, since some changes depend on others and one is usually a build request nobody can schedule quickly. Measures close the proposal, each with a baseline already collected, a target and a date, and the strongest ones measure elapsed time rather than effort.

Same detail on both drawings

A future state drawn more coarsely than the current one always looks better. Matching the level of detail is what makes the comparison honest and the saving arguable.

Where the removed work went

Each deleted box needs a destination: automated, absorbed, batched or genuinely unnecessary. Deleting work without a destination is the commonest way a proposal quietly stops being true.

Who is worse off

There is nearly always somebody. Naming the role that gains keystrokes or minutes reads as rigor and heads off the first objection anybody with operational experience will raise.

Changes you can start on Monday

Separate what needs a build request from what needs a conversation. Proposals that mix the two lose the small changes inside a wait for something nobody has scheduled.

Measures that match the claim

If the argument is about elapsed time, the measure is elapsed time. Satisfaction and adoption are different claims and cannot demonstrate that anything moved faster.

Where marks go in NR 543 Week 7

The costliest proposal is the one that deletes a wait without saying where the work went. A box vanishes from the second drawing, the total drops, and nobody can find the minutes in anybody's day. Second is a design that only a new system could deliver, which converts the whole week into a purchase request and leaves the reader nothing to approve. Third is a saving asserted rather than derived, where the two drawings do not actually produce the number claimed underneath them. Then: the same wait removed twice in different sections; no baseline, so the target means nothing; a change with no owner; risk left out of a design that plainly creates some; and the second drawing built at a coarser level than the first, which flatters it.

Get a NR 543 Week 7 example written to your instructions

Send the assignment page, the rubric and the current state work you already have, and a Week 7 example is written to fit it and returned inside 24-48h. The first is free. If your earlier weeks produced any timings at all, include them, since a future state that cannot be subtracted from a present one is only a wish.

NR 543 Week 7 questions, answered

How ambitious should the future state be?

Small enough that the unit could do it, which is a harder discipline than it sounds. Proposals that require a new system convert the assignment into a purchase request and lose the section that was actually being marked. One removed handback and one changed trigger is a full proposal.

What if I have no real numbers from the earlier weeks?

Use estimates and label them as estimates throughout. A proposal built on figures marked approximate is markable; one built on figures presented as exact when they were guessed is not, and markers can usually tell. State the basis once at the start and the rest of the paper stays honest.

Should the proposal include a timeline?

A short one, if the prompt asks for it. Sequencing matters more than dates in this assignment, because some changes cannot begin until another is finished. A list ordered by dependency, with a note on which item is waiting on a build queue, does more for the marks than a chart of months.