FY2028 Variance Report: Video Patient Monitoring on 4 West, Approved Against Actual
Student Name
College of Nursing, Chamberlain University
NR 711: Fiscal Analysis and Project Management
Instructor Name
Month Day, Year
FY2028 Variance Report: Video Patient Monitoring on 4 West, Approved Against Actual
What Was Approved
In April 2027 the patient safety capital committee approved $96,000 in capital for video monitoring on 4 West and added a contingency reserve of $4,800, held by the director of clinical engineering. The operating budget carried $15,110 one-time for training and parallel running and $119,520 recurring to cover the license and half the cost of one monitor technician. The approved total for FY2028, 1 July 2027 to 30 June 2028, was therefore $235,430. This report compares each approved line with what was spent, explains each difference by what happened and recommends what to do with the balance. The approved figure is the anchor throughout, because a report of spending alone cannot tell a reader whether the project kept its promise (Finkler et al., 2013).
The Comparison
Table 1
Video Monitoring on 4 West, FY2028 Approved and Actual
| Line | Approved | Actual | Difference |
|---|---|---|---|
| Camera units | $62,400 | $62,400 | $0 |
| Central monitoring station | $8,600 | $9,150 | +$550 |
| Installation and network | $14,800 | $19,960 | +$5,160 |
| Vendor configuration | $10,200 | $10,200 | $0 |
| Contingency reserve | $4,800 | $0 | -$4,800 |
| Training backfill | $11,078 | $8,638 | -$2,440 |
| Parallel running | $4,032 | $8,064 | +$4,032 |
| Software license | $14,400 | $14,400 | $0 |
| Monitor technician, half share | $105,120 | $95,014 | -$10,106 |
| Total | $235,430 | $227,826 | -$7,604 |
Note. Note. A plus sign marks spending above the approved line; a minus sign marks spending below it. The differences sum to the total.
What Happened, Line by Line
Installation ran $5,160 over. When the electricians opened the walls in rooms 14 and 15 in May 2027, both turned out to be plaster over block with no conduit path, and the only safe route was surface raceway along the corridor ceiling. The change order was signed on 22 May. The same discovery explains the delay described below.
The central station ran $550 over because a third screen was added in the third week. With six patient tiles on each of two screens, the technicians could not see a patient's hands at night, which is the cue they most need before a patient stands. The third screen was the item the costing sheet had named and left out, at almost exactly the figure it gave.
The contingency reserve was not spent as its own line; it absorbed $4,800 of the $5,710 capital overrun. The remaining $910 was charged to the hospital's capital overrun account with the chief financial officer's approval on 12 June 2027. The capital block therefore closed $910 above its approved total including the reserve.
Training cost $2,440 less than approved. The vendor trainer agreed to run twenty-minute sessions for two weeks, each one opening a shift, so most nurses learned the system inside paid shift time. Only 76 nurse hours needed backfill, against 116 planned.
Parallel running cost $4,032 more, double the plan. Cameras 7 and 11 dropped off the network repeatedly in the first week, and the nurse manager kept sitters in place until the unit had gone fourteen consecutive days with no dropout. That took 28 days instead of 14. The decision was right, and it should be costed into the next unit's plan as the expected case.
The technician share was $10,106 under, because the installation delay moved go-live from 1 July to 5 August. The unit is charged its share only from go-live, so it paid for 47 weeks rather than 52.
The license cost exactly what was approved, and that is not good news either. The license term began on the contract date, so about $1,385 of license value ran for five weeks with no camera switched on.
The Underspend Is Not a Saving
The project closed $7,604 under its approved total, and it would be easy to report that as good management. It was not. Almost all of it is the technician share that went unspent because the project started late. That money was set aside in July and sat unused until this report, eleven months later, while the unit's own residency preceptor allowance, $21,600, went unfunded for lack of a donor line. Had the unit told the finance office in August that the technician charge would start five weeks late, the $10,106 could have been released then. Money held for a purpose that is not happening is a request elsewhere that waited for nothing (Dunham-Taylor & Pinczuk, 2015).
What the Program Was Meant to Return
The approved case expected about 6,930 sitter hours avoided in a full year, which over 47 weeks is about 6,264. The unit avoided 5,410. The shortfall of 854 hours, worth about $22,435 at the FY2028 loaded rate of $26.27, has one main cause: in October and November the weekend charge nurse position was vacant, and the morning review of sitter orders did not happen on Saturdays and Sundays. Sitter hours on those weekends ran at the old rate. The review was restored on 2 December, and from December to June the unit met its pro-rated target in every month but February. Falls are not in this table. Published evaluations of video surveillance track falls and sitter use side by side over a longer period (Quigley et al., 2019), and the unit will report its fall counts once a full twelve months of camera data exist.
Where the Balance Goes
The operating lines closed $8,514 under approval: training $2,440 under, parallel running $4,032 over and the technician $10,106 under. I recommend releasing the full $8,514 to the finance office now, before the fiscal year closes, rather than asking to carry it forward. The program does not need it, since FY2029 is fully budgeted on its own lines. I would ask that the finance office consider it against the unfunded residency preceptor allowance, but that decision belongs to the director of nursing and the finance office, not to this project.
The $910 capital overrun stays as reported. It cannot be offset against operating savings, because the two come from different funds, and netting them would hide a capital overrun inside an operating report.
What Changes for FY2029
Three things change. The second unit to adopt video monitoring should budget 28 days of parallel running, not 14. The license should start on go-live, which the vendor has agreed to in the renewal draft. And weekend sitter review now has a named owner, the weekend house supervisor, whenever the charge nurse position is vacant.
Check on the Differences
The nine differences add to $7,604 under: $550, $5,160 and $4,032 over, totaling $9,742; and $4,800, $2,440 and $10,106 under, totaling $17,346. Approved minus actual, $235,430 less $227,826, gives the same figure.
References
Dunham-Taylor, J., & Pinczuk, J. Z. (2015). Financial management for nurse managers: Merging the heart with the dollar (3rd ed.). Jones & Bartlett Learning.
Finkler, S. A., Jones, C. B., & Kovner, C. T. (2013). Financial management for nurse managers and executives (4th ed.). Elsevier Saunders.
Quigley, P. A., Votruba, L., & Kaminski, J. (2019). Outcomes of patient-engaged video surveillance on falls and other adverse events. Clinics in Geriatric Medicine, 35(2), 253-263. https://doi.org/10.1016/j.cger.2019.01.005
Reading the NR 711 Week 5 instructions
Put the approved figure at the center of everything, because without it the report is only a list of spending. Show a short table for the funded project, not the whole department, with three columns: approved, actual and difference. Explain each difference in one or two sentences naming what happened, specific enough that a reader could have predicted the number from the sentence. Treat money left unspent as seriously as money overspent, and say how long it sat unused and what else might have used it. Keep capital and operating funds apart. Report how the project performed against what it was meant to return, if your project had a measurable benefit. Recommend where any balance should go and name who decides. Close by showing the differences add to the total, and list what you would change in the next year's plan.
Inside the NR 711 Week 5 example
The sample opens with what the committee approved in April 2027, including a $4,800 reserve, so the total of $235,430 is fixed before any spending appears. The table follows with nine lines. Installation ran $5,160 over after two rooms turned out to have plaster over block, dated by a change order on 22 May; the station ran $550 over for a third screen; parallel running doubled to 28 days after two cameras dropped off the network. Training came in $2,440 under, because sessions ran inside shift time. The technician share fell $10,106 short of plan because go-live slipped five weeks. The paper then sets 5,410 avoided sitter hours against an expected 6,264, ties the shortfall to a weekend vacancy, recommends releasing $8,514 and names three changes for FY2029.
Where the points sit in the NR 711 Week 5 rubric
The heaviest loss goes to a report with no approved figure in it, which reduces the document to a record of spending. Close behind is the difference explained by a category rather than an event: staffing pressures or unforeseen circumstances tell the reader nothing about what happened. Underspending presented as good news costs marks as well, since a balance held for eleven months is money another request could have used. Graders also check that the differences add to the total shown and that capital and operating funds are not netted together. Points go for a recommendation on the balance with a named decision maker, for honest reporting of a benefit shortfall and for lessons written as specific changes to next year's plan rather than general resolutions.
NR 711 Week 5 help from the desk
Variance reports are often written from a spending report with the approved column added at the end. Send us your project's approved budget, the actual figures and a few notes on what happened during the year, and we can help you match each difference to an event, separate capital from operating lines and write the recommendation on any balance. We can also check that your differences add up before the report goes in. The events, the figures and the judgment about what the money should do next are yours to provide.
Get a NR 711 Week 5 example written to your instructions
Send the assignment, any figures your section supplied for the period, and the format if a worksheet was issued. A custom variance write-up returns inside 24-48h with each difference carrying a cause and the balance given a destination, first one free. Where no figures came with it, we build a plausible period and flag every input where it sits.
More NR 711 papers and MSN samples
- NR 711 Week 1: Competing Requests Post
- NR 711 Week 2: Three-Year Cost Analysis
- NR 711 Week 3: Operating Budget Draft
- NR 711 Week 4: Capital Business Case
- NR 711 Week 6: Project Scope Statement
- NR 711 Week 7: Risk Register
- NR 711 Week 8: Funding Recommendation
- NR 703 Week 5: Decision Analysis
- NR 670 Week 5: Conflict Decision
- NR 529 Week 5: Unit Budget Review
- NR 632 Week 5: Outcome Comparison
NR 711 Week 5 questions, answered
Is this the same as the monthly departmental variance?
It is a different object, and treating it as one costs marks here. A departmental report explains a cost center against its plan for a period. This one holds a funded request against the specific amount granted to it and answers to the body that granted it, which is why the balance needs a destination and the department report does not.
What if the funded work came in exactly on the approved figure?
Then look inside the categories, because a total landing on the number usually conceals a pair of gaps pointing in opposite directions. Showing that a saving on equipment paid for an overrun on hours tells the funding body more than a matching total ever could, and it demonstrates that you compared the parts rather than reading the bottom line and stopping.
Can I write about a project that was never funded?
Yes, if the assignment allows a hypothetical, and it can make a sharp document. Set the amount you would have asked for against what the work would actually have cost, and the write-up becomes an argument about whether the refusal was correct. Say clearly in the opening that the figures are constructed, and hold that labeling throughout.
Where can I find a free NR 711 Week 5 sample paper?
The full first-year variance report for a video monitoring project, with its approved and actual table, is on this page.
Why does the NR 711 Week 5 report call its underspend a problem?
Most of it was a technician share held for a program that started late, and that money sat unused for eleven months while another request went unfunded.