NR 714 Week 7 Evaluation Plan Example

Application of Analytic Methods II Chamberlain University Free custom sample in 24 to 48h

A year of evaluation that a unit could run without the person who designed it is laid out in this NR 714 Week 7 sample paper. Chamberlain NR 714 (NR-714), Application of Analytic Methods II, asks Doctor of Nursing Practice (DNP) students for a plan to evaluate their change. The sample covers April 2027 to March 2028 for a peripheral IV securement bundle and pairs one outcome with two process measures and two balancing measures, each with a source, schedule, owner and cost in staff minutes, about four hours a month in all. It fixes decision rules in advance, names four other changes in the same months and adds a comparison unit, 5 North, whose rate barely moved.

CourseNR 714 Application of Analytic Methods II
Week7
Paper typeEvaluation plan
LengthAbout 1,110 words, 5 pages
FormatAPA 7 student paper
SchoolChamberlain University
ProgramDoctor of Nursing Practice (DNP)
UpdatedOctober 2026

Free sample paper for NR 714 Week 7

1

Evaluation Plan for the Peripheral IV Securement Bundle on 4 North, April 2027 to March 2028

Student Name

College of Nursing, Chamberlain University

NR 714: Application of Analytic Methods II

Instructor Name

Month Day, Year

What this page is doingThe title fixes the evaluation window, so every measure, rule and owner in the plan is read against a stated year rather than an open-ended intention.
2

Evaluation Plan for the Peripheral IV Securement Bundle on 4 North, April 2027 to March 2028

What This Plan Is For

The securement bundle on 4 North was followed by a fall in premature catheter failure from 103.2 to 78.1 per 1,000 catheter-days over six months. This plan sets out how the unit will evaluate the bundle for the next twelve months, April 2027 to March 2028, after the project lead's involvement ends. It is written so that the unit could run it without the person who wrote it: every measure has a definition, a source, a schedule, an owner and a stated cost in staff minutes (Langley et al., 2009).

Outcome, Process and Balancing Together

Table 1

Evaluation Measures for the Securement Bundle, 4 North, April 2027 to March 2028

MeasureTypeDefinition and sourceScheduleOwnerMinutes per month
Premature failures per 1,000 catheter-daysOutcomeAs defined in the outcome write-up; lines, drains and airways reportMonthly, third business dayUnit data analyst35
Bundle complete on audited cathetersProcessAll three parts present on 10 randomly chosen catheters a week; bedside audit sheetWeeklyCharge nurses, rotating130
Site score documented each shiftProcessShifts with a score divided by shifts with a catheter in place; flowsheet reportMonthlyUnit data analyst10
Adhesive-related skin injuriesBalancingIncident reports coded as medical adhesive injury, 4 NorthMonthlyNurse manager10
Added supply cost per catheterBalancingBundle supplies issued divided by catheters; materials managementQuarterlyUnit educator5
Monthly review of all fiveTen-minute item at the practice councilMonthlyPractice council chair60

Note. Note. Total about 250 staff minutes a month, roughly four hours. The review line counts three people for 20 minutes.

The outcome alone could not tell the unit why a result moved. If failures rise next winter, the process measures show whether the bundle was still being applied; a rise with the bundle in place is a different problem from a rise without it. The skin injury count watches for the one side effect that appeared in the first six months, when injuries rose from 2 to 7, all in patients over 80.

What this page is doingPairing every outcome with a process measure lets the unit tell a bundle that stopped working from a bundle that stopped being used.
3

Effort Stated in Minutes

The plan costs about four hours of staff time a month, most of it the weekly bedside audit: ten catheters at about three minutes each. The audit was cut from 25 catheters a week during the project to 10, because ten a week, about 43 a month, is enough to see whether completion stays above 80% while costing a charge nurse half an hour. Any plan that needed more would be dropped the first busy month, and a plan that stops is worse than a smaller one that runs.

Analysis, Matching the Earlier Plan

The outcome continues on the same u-chart, keeping the January to August 2026 center line and limits unchanged until the shift rule is met. Once eight consecutive months fall below the baseline center line, new limits will be calculated from the post-bundle months and used from then on. Each quarter, the rate ratio against the baseline will be reported with its 95% confidence interval, computed exactly as in the analysis plan (Provost & Murray, 2022). The process and balancing measures will be shown as simple monthly counts and percentages.

The Decision Rules, Fixed Now

These rules were agreed by the practice council on 2 April 2027 and will not be changed during the year.

If any month's failure rate rises above the baseline upper control limit, or two consecutive months rise above the post-bundle center line once it exists, the council reviews the month within two weeks, beginning with the process measures.

If bundle completion falls below 70% in any month, the unit educator runs a ten-minute refresher at each shift huddle the following week, regardless of the outcome figure.

If three or more adhesive-related skin injuries are reported in one month, tissue adhesive is paused for patients over 80 until the wound care nurse has reviewed each case and advised.

If, at the end of the year, the rate ratio's confidence interval includes 1.0, the council will report that the reduction has not held and decide whether to keep the bundle on cost grounds alone.

What this page is doingWriting the rule for calling the bundle a failure, before the year begins, is what prevents every result from being explained away.
4

What Else Changed That Quarter

Comparing one unit with itself across time leaves the result open to anything else that happened in those months, and four things did (Portela et al., 2015). First, in October 2026 the hospital replaced its infusion pumps with a model whose occlusion alarm is more sensitive, which could have changed how quickly nurses noticed occlusions. Second, in November 2026 the vascular access team began day-shift coverage for patients with difficult access, using ultrasound guidance, which might produce sturdier placements on every unit. Third, nine newly graduated nurses joined 4 North in September 2026, the same month the bundle began. Fourth, December and January brought the usual influenza-season census surge.

To separate the bundle from the hospital-wide changes, the evaluation adds one comparison. 5 North, a 32-bed medicine unit that did not adopt the bundle, has the same pumps and the same vascular access team. Across the same six months its rate went from 99.4 to 95.1 failures per 1,000 catheter-days, a ratio of 0.96. A hospital-wide cause would have moved both units; a fall concentrated on 4 North points toward the bundle. 5 North's rate will be pulled each month from the same report, at no extra cost in minutes beyond the analyst's run.

How Long the Baseline Is, and Why It Is Kept

The baseline stretch is eight months, January to August 2026, when monthly figures ranged from 96.0 to 111.6 without any intervention. That spread is the reference for every later month, and it will not be recalculated because a later month looks unusual. 5 North's baseline covers the same eight months and moved within a similar band. Keeping the original limits fixed until the shift rule is met protects the plan from the most common way a sustained gain is misread: adjusting the comparison until the latest month looks ordinary.

What this page is doingExplaining why the baseline limits are frozen shows the reader how the plan guards against redrawing the comparison after the fact.
5

Who Watches It Afterward

From April 2027, the practice council chair owns this plan. The data analyst runs the reports, the charge nurses run the audits, and the nurse manager reports the year's results to the nursing quality committee in April 2028. The project lead will attend the first two monthly reviews to hand over and then step back.

References

Langley, G. J., Moen, R. D., Nolan, K. M., Nolan, T. W., Norman, C. L., & Provost, L. P. (2009). The improvement guide: A practical approach to enhancing organizational performance (2nd ed.). Jossey-Bass.

Portela, M. C., Pronovost, P. J., Woodcock, T., Carter, P., & Dixon-Woods, M. (2015). How to study improvement interventions: A brief overview of possible study types. BMJ Quality & Safety, 24(5), 325-336. https://doi.org/10.1136/bmjqs-2014-003620

Provost, L. P., & Murray, S. K. (2022). The health care data guide: Learning from data for improvement (2nd ed.). Jossey-Bass.

What the NR 714 Week 7 assignment asks for

Present your measures as a set: an outcome that answers the practice question, a process measure that shows whether the change was delivered and a balancing measure that watches for harm elsewhere. For each, give the definition, source, schedule and the person responsible, and state the collection effort in minutes so a manager can judge whether it is affordable. Name the analysis ahead of time and keep it consistent with the plan you wrote earlier in the course. Write the decision rules now, including the result that would count as failure. Name the specific events that happened in your setting during the same period and say how you will separate them from your change, ideally with a comparison. Say how long your baseline is and why you will not redraw it. Close with who owns the evaluation once the project ends.

How the NR 714 Week 7 example is put together

The sample's table lists five measures and a monthly review, each with an owner and minutes per month, and its note totals about 250 minutes. The text explains why the outcome alone could not distinguish a bundle that stopped working from one that stopped being used, and why the weekly audit was cut from 25 catheters to 10. The analysis keeps the original u-chart limits until eight months fall below the center line, then reports a rate ratio each quarter. Four decision rules follow, including a pause on adhesive for patients over 80 if three skin injuries occur in a month. The attribution section names new pumps, a vascular access team, nine new graduates and a census surge, and uses 5 North as a comparison unit with a rate ratio of 0.96.

NR 714 Week 7 rubric: what full points look like

The plan loses most for a measure set with no process measure, which leaves the writer unable to tell a change that failed from one that was never delivered. Next is a decision rule written after the fact, or missing, so that no result could ever be called a failure. Marks also go when there is no balancing measure for a change with obvious side effects, when the collection effort is never estimated and when definitions drift from earlier assignments. Threats to attribution listed generically, rather than named for this unit and these months, cost points, as does a baseline too short to show the measure's ordinary movement. Plans score well when they name who watches the measures after the project ends and how often.

Common NR 714 Week 7 mistakes, and how to avoid them

Most evaluation plans list measures but leave out the effort, the rules and the competing explanations. Share your change, your setting and what else was happening around it, and we can help you build a measure set with owners and minutes, write decision rules in advance, find a comparison group and name the specific threats to attribution. We can also help you hand the plan to someone else in a way they can run. The measures, rules and judgments reflect your own setting and project.

Get a NR 714 Week 7 example written to your instructions

Send us the assignment instructions, the rubric and a short description of the practice change, the unit and the window you are working in. An original evaluation plan is written to those specifics and returned inside 24 to 48 hours. The first one is free, and it is built for your project rather than adapted from anyone else's.

More NR 714 papers and DNP samples

NR 714 Week 7 questions, answered

How does this differ from an undergraduate evaluation plan?

The measures can look similar and the reasoning around them does not. A doctoral plan commits to its decision rule in advance, estimates what the available numbers could realistically detect, and takes attribution seriously enough to name the other things happening on the unit. It is judged on whether a reader could run it and on whether the writer knows what it will fail to prove.

Does the plan need a full statistical section?

It needs to agree with the analysis already planned rather than repeat it at length. A short section naming the comparison, the procedure and the reason it fits usually satisfies the requirement. Where the two documents disagree with each other, markers spot it quickly, so the safest approach carries the earlier wording across and adjusts only where something has genuinely changed.

Can I use it for a project that has not started?

That is the usual case, and the plan is written prospectively by design. Give us the setting, the change, the outcome you intend to move and the length of your window, and the example is constructed around those. Everything stays at the level of the practice change, so no patient level record or site document is ever needed from you.

Where can I find a free NR 714 Week 7 sample paper?

This page carries a full twelve-month evaluation plan for a peripheral IV securement bundle, with owners, minutes and decision rules.

Why does the NR 714 Week 7 plan add a second unit?

5 North had the same new pumps and vascular access team but no bundle, so its flat rate helps separate the bundle from hospital-wide changes.