| Course | NR 709A DNP Project & Practicum IV |
|---|---|
| Week | 6 |
| Paper type | Transfer conditions memo |
| Length | About 860 words, 4 pages |
| Format | Memo with APA 7 citations |
| School | Chamberlain University |
| Program | Doctor of Nursing Practice (DNP) |
| Updated | October 2026 |
Free sample paper for NR 709A Week 6
Memorandum
To: Dr. Simone Carter, medical director, Eastside site
From: DNP student, Northgate site project
Date: 26 July 2027
Re: Conditions for trying the same-day behavioral health handoff at Eastside
Purpose
You asked at the July operations meeting whether the same-day behavioral health handoff tested at Northgate from March to May 2027 could work at Eastside. This memo does not argue that it will. It lists the conditions that were in place at Northgate, so you can check each against Eastside and decide whether a test there makes sense.
In brief, the change was this: a positive depression screen at rooming, meaning a total of 10 or higher, now prompts an instant message to the on-site consultant, who tries to see the patient during that visit. Patients who leave first are telephoned by midday the following working day. At Northgate, 30-day behavioral health contact rose from 32.6% to 53.1% over twelve weeks, at one site, in one season.
The Conditions
Each condition is written so you can answer yes or no about Eastside. Implementation frameworks group conditions like these by the setting, the people and the process (Damschroder et al., 2009); here they are listed in the order they mattered at Northgate.
1. Is a behavioral health clinician physically on site during most primary care hours, at least four days a week?
2. Can that clinician's schedule hold two open slots a day that the front desk cannot book over?
3. Is the PHQ-9 recorded by the medical assistant during rooming, rather than by the clinician later in the visit?
4. Does the record system allow a message to a group or individual that the clinician sees within a few minutes?
5. Is there a staff member, other than the consultant, whose job can include next-day calls before noon?
6. Is there a standing weekly meeting the medical assistants attend, where a five-minute training could happen?
7. Can someone produce a daily list of patients screened positive and not seen, without hand counting?
8. Is at least one person on the behavioral health side able to speak with Spanish-speaking patients directly?
What Happens Without Each
Without condition 1, there is no same-day part; the change becomes a faster callback, which may still help but is a different intervention. Without 2, the slots are lost to routine bookings, as happened at Northgate on three days in the first week. Without 3, the screen comes too late for the message to reach the consultant before the patient leaves. Without 4, staff fall back on walking to find the consultant, which works on quiet days only. Without 5, the patients not seen the same day, more than a third at Northgate, are left to the old callback. Without 6, training depends on emails, which reached only some staff in the Northgate pilot.
What Northgate Built and What It Was Handed
Some of the conditions at Northgate were built during the project and can be built at Eastside: the scheduling hold, the message template, the daily report, the pocket cards, the training script. These are in the Northgate handover packet and can be copied.
Others were handed to the project and cannot be copied by a document. Northgate's consultant had worked there for four years and knew most clinicians by name. The behavioral health assistant is bilingual. The medical assistant lead had run a previous change and was trusted on the floor. The staffing roster was unusually stable through the spring; no medical assistant left during the test. Sustaining a program depends on such factors as much as on its design (Scheirer & Dearing, 2011), and a test at Eastside should not assume them.
What Would Change This Answer
The case for trying the handoff at Eastside would be stronger if Northgate's monthly rate holds above 45% through the summer, when the consultant takes annual leave, and if the payer's video coverage is shown to explain only part of the rise. It would be weaker if the rate falls back after the student leaves, or if Northgate's missed follow-up rate climbs above 20%. The first of these monthly figures will be available on 5 August 2027 from the quality analyst.
Evidence from integrated care trials supports the general approach (Archer et al., 2012), but the question for Eastside is local: whether the conditions above are present, not whether integrated care works in general.
Suggested Next Step
If you answer yes to conditions 1 to 5, a twelve-week test at Eastside could begin in the autumn, using the Northgate materials. If you answer no to 1 or 2, I would suggest starting with the faster callback alone and measuring whether that is enough. I am available until 20 August to walk through the conditions with your team. After that date, the director of behavioral health holds the Northgate materials and has agreed to share them, and the quality analyst can set up the same daily and monthly reports for Eastside from the existing templates in about a day. A short meeting between your medical assistant lead and Northgate's would probably answer more of the practical questions than this memo can.
References
Archer, J., Bower, P., Gilbody, S., Lovell, K., Richards, D., Gask, L., Dickens, C., & Coventry, P. (2012). Collaborative care for depression and anxiety problems. Cochrane Database of Systematic Reviews, 2012(10), CD006525. https://doi.org/10.1002/14651858.CD006525.pub2
Damschroder, L. J., Aron, D. C., Keith, R. E., Kirsh, S. R., Alexander, J. A., & Lowery, J. C. (2009). Fostering implementation of health services research findings into practice: A consolidated framework for advancing implementation science. Implementation Science, 4, Article 50. https://doi.org/10.1186/1748-5908-4-50
Scheirer, M. A., & Dearing, J. W. (2011). An agenda for research on the sustainability of public health programs. American Journal of Public Health, 101(11), 2059-2067. https://doi.org/10.2105/AJPH.2011.300193
Reading the NR 709A Week 6 instructions
Address the memo to one named reader and keep it to three or four pages, most of them a list. Open with a short paragraph on what the change was and what it produced, without arguing that it will work elsewhere. Write six to eight conditions, each a sentence the reader can answer yes or no about their own area: a field that already exists, a meeting that already happens, a role that already includes the task. After the list, say what happens to the change when each condition is missing. Separate what your site built during the project, which can be copied, from what it was handed, such as experienced staff or a stable roster, which cannot. Name the evidence that would change your answer and when it will be available. End with a next step that depends on the reader's answers.
How this NR 709A Week 6 example is built
The sample's memo goes to the medical director of a second site on 26 July 2027, after a question at the July operations meeting. It summarizes the handoff and its rise from 32.6% to 53.1% at one site in one season. Eight conditions follow, including a behavioral health clinician on site at least four days a week, two open slots the front desk cannot book over, the PHQ-9 recorded at rooming, a staff member for next-day calls and someone who can speak with Spanish-speaking patients. Each has a consequence, such as forty minutes of hand counting a day without an automated list. Built items include the hold and the reports; handed items include a consultant with four years at the site and a bilingual assistant. The case strengthens if the rate stays above 45% through the summer.
Reading the NR 709A Week 6 grading rubric
Transfer memos lose most when conditions are written as advice, such as saying the unit should ensure adequate leadership support, which a reader cannot check against anything on their own floor. Not far behind is the transfer claim with nothing under it, describing a change as suitable for any setting from a project that ran on one unit for a season. Many memos skip what happens when a condition is missing, so the reader cannot judge whether a partial match is worth trying. A further loss comes from leaving out the luck: a stable roster, an experienced colleague or a bilingual staff member that the first site was handed. Memos addressed to everyone tend to be read by no one. Writers also forget to name the evidence that would change their recommendation, which leaves the reader no way to revisit it.
NR 709A Week 6 help from the desk
Telling another manager what they would need, without overselling your own result, takes a different voice from the rest of the project. Working from your site's experience, we can help you turn what mattered into conditions a reader can answer yes or no, and say what happens without each. We can also help you separate what you built from what you were handed and name the evidence that would change your view. Walking a colleague from the other site through the list before sending it often shows which conditions are unclear. The memo and its recommendation are yours.
Get a NR 709A Week 6 example written to your instructions
Give us the week six instructions plus one line about the unit you are writing to, and the memo comes back addressed to that reader, with the conditions ordered by how hard each is to get and a consequence beside every one. Inside 24-48h, free the first time. No unit in mind? Send the assignment and the example picks a plausible one.
More NR 709A papers and DNP samples
- NR 709A Week 1: First Week Post
- NR 709A Week 2: Results and Limits Paper
- NR 709A Week 3: Baseline to Endpoint Comparison
- NR 709A Week 4: Conference Abstract Draft
- NR 709A Week 5: Handover Packet Outline
- NR 709A Week 7: Final Evaluation Summary
- NR 709A Week 8: Project Closeout Memo
- NR 707A Week 6: Staff Feedback Write-Up
- NR 705A Week 6: Survey Instrument
- NR 702A Week 6: Project Charter
NR 709A Week 6 questions, answered
Is this the same as a spread or scale-up plan?
It is the document that comes before one. A plan commits resources and dates to putting the change somewhere else; this memo only establishes whether that would be sensible, and for whom. Many projects stop here honestly, with a memo saying two units in the building could run this and the rest could not, which is a more useful finding than an ambitious plan nobody funds.
How many conditions is the right number?
Enough that the list is honest, few enough that it gets read. Six to eight is a workable target, and a memo listing twenty has usually mixed genuine preconditions with ordinary requirements every unit already meets. The test for each entry is whether a reasonable site might fail it. If none could, it is describing a hospital rather than a condition, and it can go.
Can the memo recommend the change be adopted elsewhere?
It can state which conditions must already be present, and it can point at the units in a system that appear to have them. What it cannot do is convert a single-site result into a recommendation, because nothing in the project tested the change anywhere else. Doctoral readers treat the restraint as evidence of judgment, and the leap as evidence that the limits section was written for show.
Where can I find a free NR 709A Week 6 sample paper?
The finished transfer conditions memo to a second clinic's medical director is reproduced on this page.
What does the NR 709A Week 6 memo say was handed, not built?
A consultant with four years at the site, a bilingual behavioral health assistant, a trusted medical assistant lead and a roster that stayed stable all spring.