NR 711 Week 6 Project Scope Statement Example

Fiscal Analysis and Project Management Chamberlain University Free custom sample in 24 to 48h

A scope statement with a price beside everything it leaves out is what this NR 711 Week 6 sample paper offers. Chamberlain NR 711 (NR-711), Fiscal Analysis and Project Management, turns MSN Nurse Executive students to defining what a funded project will deliver. The sample sets the video monitoring project on 4 West at $115,910, lists six deliverables from twelve camera units to fourteen days of parallel running with a dollar figure on each and places a $4,800 reserve under the director of clinical engineering. A second table excludes seven items, from nurse call integration to a full-time technician, each priced. The paper explains that the boundary follows the money, writes five acceptance checks with named checkers and sets change thresholds.

CourseNR 711 Fiscal Analysis and Project Management
Week6
Paper typeProject scope statement
LengthAbout 1,150 words, 5 pages
FormatAPA 7 student paper
SchoolChamberlain University
ProgramMSN, Nurse Executive
UpdatedOctober 2026

Free sample paper for NR 711 Week 6

1

Project Scope Statement: Video Patient Monitoring on 4 West, Funded at $115,910

Student Name

College of Nursing, Chamberlain University

NR 711: Fiscal Analysis and Project Management

Instructor Name

Month Day, Year

What this page is doingThe funded amount sits in the title, because every line of a scope statement is measured against it and a reader should meet the limit before the list.
2

Project Scope Statement: Video Patient Monitoring on 4 West, Funded at $115,910

Purpose and Funding

This statement fixes what the video monitoring project on 4 West will deliver with the money approved for it, and what it will not. Capital of $96,000 came from the patient safety pool, to which the committee added a $4,800 contingency reserve; the FY2028 operating budget carries $15,110 for training and parallel running. The project is therefore funded at $115,910 from approval to acceptance, 90 days after go-live. Recurring costs after acceptance, the license, the service contract and the technician share, belong to the unit's operating budget and are not project costs. The sponsor is the nursing director over the medical-surgical units; the project lead is the 4 West nurse manager.

What the Money Buys

Table 1

Funded Deliverables, Video Monitoring Project on 4 West

DeliverableDescriptionFunded amount
D1Twelve camera units on rolling carts, configured and labeled$62,400
D2Central monitoring station with two screens in room 2$8,600
D3Two network drops at the station and a power and mounting point in each of 32 rooms$14,800
D4Vendor configuration: loss-of-signal alarm, two-way audio in English and Spanish, and a camera eligibility screen in the health record$10,200
D5Training: 58 registered nurses and 22 nursing assistants for two hours, five monitor technicians for 24 hours$11,078
D6Fourteen days of parallel running with sitters in place$4,032
ReserveContingency held by the director of clinical engineering$4,800
Total$115,910

Note. Note. D1 to D4 and the reserve are capital; D5 and D6 are FY2028 operating funds.

Each deliverable is something a person can inspect and sign. A camera either streams to the station or it does not; a nurse either holds a training sign-off or does not. Money is assigned to each one so that, if a deliverable comes in over, the reader knows exactly which figure moved (Project Management Institute, 2021).

What this page is doingPutting a dollar figure beside each deliverable is what lets an overrun be traced to one line instead of argued about in total.
3

What the Money Does Not Buy

The following items are things a reasonable reader might expect a video monitoring project to include. Each is excluded, and each carries what it would add, so that anyone who wants it back knows the price of asking.

Table 2

Exclusions and Their Prices

Excluded itemWhat it would addWhy it is out
Cameras on 5 West$46,800 capitalSeparate unit, separate request
Integration with the nurse call system$18,500 one-time and $1,900 a yearNot needed for the eligibility group; alerts go to the technician
A third screen at the station$550Two screens meet the vendor's tile guidance
Recording and storage of video$7,200 a year and a privacy reviewProgram is live viewing only
Fall-detection analytics module$9,600 a yearNo evidence on this unit yet
Prerecorded messages beyond English and Spanish$400 per languageInterpreter line covers other languages
A full-time technician for 4 West alone$105,120 a year moreThe shared technician watches up to 16 patients

Note. Note. Prices from the vendor's March 2027 quote and the finance office.

Together the excluded items would add at least $65,850 in one-time spending and well over $120,000 a year. None of them is unreasonable. They are out because the money granted covers the twelve cameras and the people needed to use them, not because anyone decided they had no value.

Why the Boundary Sits Here

The boundary follows the funded amount, not the ambition behind the request. The unit would like all twelve cameras integrated with nurse call, recording available for review after a fall and analytics flagging a patient who sits up. Those are ambitions for a second phase. A scope statement that promised them on a budget that covers six deliverables would either fail to deliver them or return to the committee for more money, and the committee would be right to read either outcome as poor planning (Kerzner, 2017). The narrower scope can be delivered in full.

What this page is doingSaying that the boundary follows the money, in so many words, is what separates this document from a list of wishes.
4

How Acceptance Will Be Judged

The project is accepted when all of the following are true, each checked by the person named.

All twelve cameras stream to the station for fourteen consecutive days with no loss of signal longer than 60 seconds, checked from the vendor's log by the monitor technician lead.

At least 95% of registered nurses and nursing assistants on the 4 West roster hold a training sign-off, checked by the unit educator from the learning system.

The eligibility screen is completed for at least 90% of new sitter orders in the first 30 days after go-live, checked by the nurse manager from a record report.

All five technicians have completed 24 hours of vendor training and one supervised shift, checked by the technician lead.

The loss-of-signal alarm sounds at the station within 30 seconds when a camera is unplugged, tested on every camera by clinical engineering.

Who Holds the Reserve and What It Pays For

The $4,800 reserve is held by the director of clinical engineering, who can release up to $1,000 at a time for a capital item inside the scope, such as an extra mounting bracket or a replacement cable, and must report each release to the sponsor within a week. Anything above $1,000, and anything outside the six deliverables, goes to the sponsor. The reserve cannot pay for excluded items. If the third screen is wanted after go-live, it comes back as a change request, even though it would fit inside the reserve, because it changes the scope rather than completing it.

How Changes Are Handled

Every change request states what it adds, what it costs and which deliverable or reserve funds it. Changes under $1,000 inside scope are approved by the director of clinical engineering from the reserve. Changes between $1,000 and the remaining reserve are approved by the sponsor. Changes larger than the remaining reserve, or any change that adds a deliverable, go back to the capital committee. A change with no source of funds is declined, not deferred.

Dependencies

Three conditions outside the project's control decide whether the plan holds. If 5 West leaves the technician share, the unit's recurring cost doubles, so a two-year participation agreement must be signed before the purchase order. If the network team cannot install the drops before 15 June 2027, go-live moves and the license runs unused, so the license start date is tied to go-live in the contract. And if the vendor ships late, training dates move with it, which costs backfill twice; training is scheduled only after delivery is confirmed (Waxman, 2018).

Sign-Off

Sponsor: director of nursing, medical-surgical services. Project lead: nurse manager, 4 West. Reserve holder: director of clinical engineering. Finance: budget analyst for nursing. Each signs this statement before the purchase order is released.

What this page is doingThe sign-off block names roles rather than departments, so each acceptance check and each reserve decision has one person answerable for it.
5

References

Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). Wiley.

Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) (7th ed.). Project Management Institute.

Waxman, K. T. (2018). Financial and business management for the doctor of nursing practice (2nd ed.). Springer Publishing.

Reading the NR 711 Week 6 instructions

Begin with the funded amount and the period the project covers, and name the sponsor and the lead. List what the money buys as deliverables someone could inspect and sign off, and assign a dollar figure to each, so that an overrun can be traced to one line. Then list what the project does not include, choosing items a reasonable reader would expect to see, and put a price beside each exclusion. Explain in a short paragraph that the boundary follows the funding, not the ambition. Write acceptance criteria as checks with a number, a time period and the person who verifies them. Name who holds any reserve and what that person may approve without going back to the sponsor. Describe how changes are requested and funded, list dependencies with what happens if each fails and close with a sign-off block listing roles.

Inside the NR 711 Week 6 example

The sample states the project's funding as $96,000 capital, a $4,800 reserve and $15,110 of operating money, ending 90 days after go-live, and assigns recurring costs after that to the unit's budget. Its first table lists six deliverables, with configuration described as a loss-of-signal alarm, two-way audio in two languages and an eligibility screen in the record. The second table prices seven exclusions and explains why each is out, then adds them up to at least $65,850 one-time and more than $120,000 a year. Acceptance is defined by fourteen days without a signal loss over 60 seconds, 95% training sign-off, 90% screen use on new sitter orders, technician training and an alarm test on every camera. Reserve limits, change thresholds and three dependencies with consequences follow.

Reading the NR 711 Week 6 grading rubric

Most of the points lost here come from an exclusion list without prices. An unpriced exclusion cannot be argued about, and it tends to creep back during delivery. Close behind is scope written wider than the money, a statement promising more deliverables than the budget covers, which reads as either carelessness or a plan to ask again. A deliverable worded so that nobody could tell whether it arrived costs nearly as much. Graders then check for a reserve with a named holder and limits, for dependencies that say what happens if they fail and for objectives that are not simply the deliverables repeated. Marks also reward a change process that requires each request to name its cost and its funding, and a sign-off block that lists roles rather than departments.

NR 711 Week 6 help from the desk

Most students can list what the project includes; pricing the exclusions is where they get stuck. Send us the project, its funded amount and the items people have asked about, and we can help you price each exclusion, set a dollar figure against each deliverable and write acceptance checks someone could actually verify. We can also help you set reserve and change limits that suit your organization's approval levels. The project, the figures and the decisions about what to leave out remain yours, and the statement reflects your own organization.

Get a NR 711 Week 6 example written to your instructions

Send the scope template your classroom issued and the project you have been assigned, and a custom scope statement returns inside 24-48h with a priced exclusion list and a reserve section already in it. The first one is free. If the project is your own workplace initiative, send only what you are free to share and we work from that.

More NR 711 papers and MSN samples

NR 711 Week 6 questions, answered

How much detail belongs in an exclusion?

Enough that a reader could ask for it as a change and be quoted a price. Training for a second department, a reporting build, evening coverage during rollout: each is a named thing with a number beside it. A general statement about the project not covering everything protects nobody and is read as filler.

What if I do not have a funded amount to work from?

Assume one, state it in the first line, and keep every later figure consistent with it. Sections care that the boundary has a cause, and an assumed grant of a stated size gives the exclusions something to be excluded by. A scope statement floating free of any amount reads as a description of a project rather than a commitment about one.

How big should the reserve be?

Whatever you can justify in a sentence, commonly a modest percentage of the funded total, and the justification matters more than the number. Say what it is for, who releases it, and what happens to whatever is left at the end. A reserve with no release rule attached is read as padding added to the ask.

Where can I find a free NR 711 Week 6 sample paper?

A complete scope statement for a funded video monitoring project, with priced deliverables and priced exclusions, is available on this page.

Why does the NR 711 Week 6 scope statement refuse to use the reserve for a third screen?

Because adding the screen would change the scope rather than complete it, so it must come back as a change request even though the reserve could pay for it.