NR 528 Week 6 Measurement Plan Example

Leading and Managing Evidence-Based Change in Nursing Chamberlain University Free custom sample in 24 to 48h

This NR 528 Week 6 sample paper is a measurement plan arguing that when each count is taken matters more than which measure is chosen. For Chamberlain NR 528 (NR-528 in the catalog), Week 6 has MSN students decide how their change will be evaluated. The plan counts the share of tube-fed patients with the head of the bed at 30 degrees or higher, adds a pressure injury balancing measure, and schedules a first baseline taken before any announcement. It reads the counts on run charts with separate day and night lines, describes auditor agreement on ten beds, states what the design cannot claim about aspiration and explains how results reach staff within two days without naming anyone.

CourseNR 528 Leading and Managing Evidence-Based Change in Nursing
Week6
Paper typeMeasurement plan
LengthAbout 1,130 words, 3 pages
FormatAPA 7 student paper
SchoolChamberlain University
ProgramMSN
UpdatedSeptember 2026

Free sample paper for NR 528 Week 6

1

Measurement Plan: What Gets Counted for the Head-of-Bed Practice, When Each Count Is Taken, and Why the Order of the Counts Matters More Than the Choice of Measure

Student Name

College of Nursing, Chamberlain University

NR 528: Leading and Managing Evidence-Based Change in Nursing

Instructor Name

Month Day, Year

What this page is doingThe title puts timing ahead of choice of measure, because a count taken in the wrong week cannot be repaired afterward. Student APA 7 title page.
2

Measurement Plan: What Gets Counted for the Head-of-Bed Practice, When Each Count Is Taken, and Why the Order of the Counts Matters More Than the Choice of Measure

The Problem of Order

If the unit counts head-of-bed angles only after teaching, it will measure the teaching: a burst of attention while the practice is new, which says little about whether it will last. If it counts only once before and once after, it cannot tell a real change from ordinary week-to-week variation. The measurement plan for our progressive care unit's head-of-bed practice is therefore built around when counts are taken as much as what is counted. It uses three baseline periods, a weekly count during the change and a monthly count afterward, and it displays every count on a run chart by shift.

What Is Counted

The main process measure. The proportion of observations in which a patient on continuous tube feeding has the head of the bed at 30 degrees or higher, read from the bed's angle indicator. Observations with a documented contraindication count as meeting the practice. This measure matches the practice brief directly and is the one the unit's target, 85% on both shifts, is set against.

A documentation measure. The proportion of observed patients whose flowsheet records the head-of-bed angle for that shift, and, for patients kept lower, whether a contraindication order exists. This shows whether the documentation built for the project is being used, and it will reveal a gap between what is done and what is recorded.

A balancing measure. The number of new sacral or heel pressure injuries of stage 2 or worse among tube-fed patients each month. Raising the head of the bed increases pressure and shear on these areas, and the wound care nurse's concern deserves a number of its own. If the process measure rises and the balancing measure rises with it, the unit has traded one harm for another.

An outcome measure. Suspected aspiration events among tube-fed patients, defined as a rapid response call or a new chest radiograph ordered for suspected aspiration, per 1,000 tube-feeding patient-days. This matters most to patients but will move slowly and noisily on a 24-bed unit, so it is reported but not used to judge the project in its first months. The protocol studied by Metheny et al. (2010) was associated with much lower aspiration and pneumonia, but that was in intensive care, with a combined protocol, and our numbers will be far smaller.

What this page is doingEach measure has a stated purpose, including a balancing measure for the harm the change could cause, which prevents the plan from counting only what is likely to improve.
3

When Each Count Is Taken

Baseline 1, before any announcement. Two weeks of observations at 1000, 1600, 2200 and 0400, taken before the project was mentioned to staff. This produced the 41% figure in the practice brief, with 52% on days and 28% on nights. It is the only count free of any project effect.

Baseline 2, after the announcement and before teaching. One week of observations in week 6, after huddle updates had begun but before any teaching. The difference between Baseline 1 and Baseline 2 shows how much the announcement alone changed practice. If compliance rises sharply here, the unit will know that attention, not the practice itself, is doing part of the work.

Weekly counts during the change. From go-live in week 8 through week 16, the same four observation times weekly, plus two unannounced checks each week at random times, so that staff cannot anticipate every audit.

Monthly counts afterward. From week 17, one week of observations each month at the four set times, continuing indefinitely.

How the Counts Are Read

Each measure is plotted on a run chart, one line for days and one for nights, with the median of the baseline period marked. Run charts allow a unit to distinguish a real shift in performance from random variation using simple rules, for example a long unbroken stretch of weeks sitting on the same side of the center line (Perla et al., 2011). The unit will not declare success from one good week. It will look for a sustained shift above the baseline median on each shift separately, and for the night line to move as well as the day line.

Who Counts and How Consistently

Two nurses who volunteered as auditors, one from days and one from nights, take the observations, using the same bed angle indicator reading on every bed. Before the first baseline, they observed ten beds together and agreed on nine; the disagreement, a bed at 29 degrees on a worn indicator, led to replacing that indicator and a rule that readings are taken with the patient centered in the bed. The project lead enters the data weekly and posts the run charts in the break room every Monday. Consistency matters because an audit that changes its method partway through cannot show whether practice changed or only the counting did.

What the Plan Will Not Claim

This design measures whether the unit keeps the head of the bed up, not whether that prevents aspiration on this unit. The unit is implementing, not testing, a guideline position that tube-fed adults at high aspiration risk sit at 30 to 45 degrees (McClave et al., 2016). A 24-bed unit cannot produce enough aspiration events in a year to show a reliable effect, and a fall in events could reflect other changes, such as fewer tube-fed patients. The report will therefore say that the unit achieved, or did not achieve, the recommended practice, and it will report outcome numbers alongside without claiming they prove the practice worked. That restraint protects the project from an easy criticism and keeps attention on the measure the unit can actually move.

Results will be shared with staff at the Monday huddle each week, with one sentence on what the run chart shows and one on what will be tried next. When the night line moves, night staff will hear about it first.

How Results Are Shared

Results go back to staff within two days of each audit week. The run chart is posted in the break room, and the charge nurse reads the latest day and night figures at huddle. Individual nurses are never named in shared results. If an auditor finds a flat bed, the auditor pauses the feed and raises the bed on the spot, and the observation is still counted as found. Sharing shift-level figures rather than names keeps the audit a measure of the unit's system, not a search for someone to blame, which matters to night staff who already feel watched.

References

McClave, S. A., Taylor, B. E., Martindale, R. G., Warren, M. M., Johnson, D. R., Braunschweig, C., McCarthy, M. S., Davanos, E., Rice, T. W., Cresci, G. A., Gervasio, J. M., Sacks, G. S., Roberts, P. R., & Compher, C. (2016). Guidelines for the provision and assessment of nutrition support therapy in the adult critically ill patient: Society of Critical Care Medicine (SCCM) and American Society for Parenteral and Enteral Nutrition (A.S.P.E.N.). Journal of Parenteral and Enteral Nutrition, 40(2), 159-211. https://doi.org/10.1177/0148607115621863

Metheny, N. A., Davis-Jackson, J., & Stewart, B. J. (2010). Effectiveness of an aspiration risk-reduction protocol. Nursing Research, 59(1), 18-25. https://doi.org/10.1097/NNR.0b013e3181c3ba05

Perla, R. J., Provost, L. P., & Murray, S. K. (2011). The run chart: A simple analytical tool for learning from variation in healthcare processes. BMJ Quality & Safety, 20(1), 46-51. https://doi.org/10.1136/bmjqs.2009.037895

What the NR 528 Week 6 assignment asks for

This week you design how you will evaluate your practice change. Prompts usually ask for process and outcome measures, data sources, collection methods and frequency, the timing of baseline and follow-up, how data will be analyzed and how results will be shared. Many sections expect a balancing measure. Think about timing as carefully as the measures themselves; a baseline collected after staff have heard about the project already reflects the project. Plan who will collect data and how you will check consistency between collectors. Be honest about what your design can and cannot show. Cite quality improvement and measurement sources in APA 7, and keep to the length and format your section sets, including any required table.

How this NR 528 Week 6 example is built

The plan opens with the problem of order, explaining how a count taken after teaching measures a burst of attention. The measures section defines the main process measure, a balancing measure for sacral and heel injuries and an outcome count of aspiration events reported for context. A timing section lists a first baseline before any announcement, a second before teaching and audit weeks through go-live. Counts are read on run charts with simple rules for real change. A section describes two volunteer auditors, their agreement on nine of ten beds and how the disagreement was resolved. The plan then states that it tests adherence, not effect on aspiration, and describes posting results within two days.

NR 528 Week 6 rubric: what full points look like

Measurement plan rubrics usually award points for appropriate process, outcome and balancing measures, feasible data collection, sound timing, suitable analysis and a plan for sharing results. Graders reward measures defined precisely enough that two people would count the same way. A baseline taken before staff know about the project is a strong feature and often earns credit for rigor. Run charts or similar methods suited to unit-level improvement show fit between design and purpose. Attention to consistency between data collectors and to limits of the design reflects mature analysis. Sharing results quickly and without blame scores under leadership. Quality improvement sources cited in APA 7 and clear organization complete the rubric in most sections of the course.

Common NR 528 Week 6 mistakes, and how to avoid them

The biggest gap in many measurement plans is a baseline taken too late, after the project is already known, so that later gains look smaller than they are. Another is relying only on outcome measures, such as event rates, that are too rare on one unit to show change within a term. Pair them with a process measure. Students also forget balancing measures, which leaves the plan unable to detect harm. Define each measure closely, including what counts as meeting it. Say who collects data and how often. Do not claim that adherence proves an effect on outcomes. Finally, plan how staff will see results; a measurement plan that reports only to managers misses its best use.

Get a NR 528 Week 6 example written to your instructions

Send the Week 6 instructions and whatever grid your classroom supplies, together with the change and a sense of what could realistically be counted where you work, and a custom example is written around reachable measures and returned inside 24 to 48 hours. The first one is free. Nothing in it will rest on figures you would have to go and request.

More NR 528 papers and MSN samples

NR 528 Week 6 questions, answered

The change already started. Can I still have a starting figure?

Sometimes, and the plan should say which. Anything the organization was already recording runs backwards, so a count that existed before the change can be read for the months before it began. What cannot be recovered is an observation nobody made. Where the figure is genuinely gone, say so and build the comparison on the earliest reading you do have, labeled as what it is.

How often, and for how long?

Often at first and rarely later is the shape that holds up: something small in the opening fortnight, then monthly, then at three months and again at six. What matters more than the interval is that the later readings have names against them, since those fall after everybody's attention has moved and are the first ones quietly dropped.

Can the person collecting also be the person being watched?

It is common and it should be stated rather than hidden. A step counted by whoever performs it produces a generous figure, which is not by itself a reason to abandon the count. Say who collects, say what that does to the number, and where you can, put one small check in somebody else's hands so the two can be set side by side.

Where can I find a free NR 528 Week 6 sample paper?

Displayed above, the head-of-bed measurement plan is the complete NR 528 Week 6 sample, and reading it is free. If your project needs measures for a different practice, describe the change on the request form and a plan with its own counts and timing can be written.

Does the NR 528 Week 6 plan need a balancing measure?

Most sections expect one, and it strengthens the plan. The sample tracks new sacral and heel pressure injuries, because raising the head of the bed can increase shear on exactly those areas.